BUILD NOTE

The week we lost to rain

SEPTEMBER 2025

Dartmoor does not schedule around you. Nine days of rain sat on the Whitstone trenches and turned the site into a lesson about why the programme has float in it. We pumped, sheeted, and did what you do when the ground says no: we went to the bench.

By the time the trenches drained, the window joinery for the whole east elevation was finished, fitted dry in the workshop, and waiting. The house handed over on the day the contract said it would. Rain costs you a week only if you have nowhere else to be useful.

Every house is holding its breath. We build the exhale.

START A PROJECT
A-000 · TITLE SHEET — ISSUED 2026

STUDIO

Ashlar Atelier
14 Quarry Bench, Kingsholt
Gloucestershire GL1 4TN

REVISION HISTORY

2011 A FOUNDED. ONE BENCH, TWO PEOPLE.2016 D THE YARD AT KINGSHOLT.2019 H RAVEN HOWE COMPLETES.2024 M THE GLASS FOLD.2026 N THIS SHEET ISSUED.

DRAWN / CHECKED

DRAWN MH · CHECKED RA · APPROVED EM

SCALE

1:1 — ALWAYS, IN THE END

STATUS

WE TAKE THREE PROJECTS A YEAR · ONE PLACE REMAINS OPEN FOR 2027

© 2026 Ashlar Atelier. All rights reserved.Privacy Notice·Terms of UseLicensed design–build contractor · Reg. No. 048-221 · Fully insuredEST. 2011
±0.000 — GROUND LINE

Create a free website with Framer, the website builder loved by startups, designers and agencies.