Architectural drawing of the house
E 0.00 · H 0.00
BUILT

DESIGN—BUILD ATELIER · EST. 2011

DRAWN.THEN BUILT.

Ashlar is a design–build atelier. Every house begins as a line on paper — run your hand across the sheet and watch it become home.

A-002 · THE ARGUMENT — WALL SECTION, DRAWN OPEN
ANYONE CANFINISH A WALL.WE BUILD WHAT'S BEHIND IT.
SIX LAYERS, EACH ONE ARGUED FOR
LIME PLASTERSERVICE VOIDOAK FRAMEWOOD-FIBRE INSULATIONMEMBRANELARCH CLADDING

SELECTED WORK · 2019 — 2026

Three houses, told honestly.

Every project here began as a drawing on this site. Touch one to build it.

LONG BARN — drawing
A-102
01

LONG BARN

COTSWOLDS · 2023 · BARN CONVERSION

A tithe barn that spent forty years as a machine shed. We kept every truss we could argue for, and lost the argument twice.

OPEN THE SET
WHITSTONE COTTAGE — drawing
A-103
02

WHITSTONE COTTAGE

DARTMOOR · 2022 · REBUILD + EXTENSION

Granite two feet thick, repointed in lime and warm for the first time in a century. The new wing defers to the old walls.

OPEN THE SET
THE GLASS FOLD — drawing
A-104
03

THE GLASS FOLD

WYE VALLEY · 2024 · GLAZED EXTENSION

Twelve tonnes of glass folded around a courtyard the planners said could not be lit. It is lit until midnight, most nights.

OPEN THE SET
THE SITE
THE FRAME
THE ENVELOPE
THE FINISH
A-004 · THE ASSEMBLY — A HOUSE IS LAYERS
01 THE SITE
02 THE FRAME
03 THE ENVELOPE
04 THE FINISH
PLOT 2 140 M²
THE SITE

The house is placed before it exists.

OAK + STEEL · 34 T
THE FRAME

The structure you will never see, done as if you would.

U-VALUE 0.13
THE ENVELOPE

Weather out, warmth in, drawn to the millimetre.

HANDOVER · WEEK 96
THE FINISH

What the years will touch.

A-005 · THE METHOD

Ninety-six weeks, drawn before they are lived.

0102030405060708
STAGE 01 — THE BRIEF · WEEKS 0—2
01

THE BRIEF

What the house must do — and what it must never.

WEEKS 0—2
02

THE SURVEY

Every level, every drain, every neighbour's window.

WEEKS 2—4
03

THE DRAWING SET

Forty sheets before a single order is placed.

WEEKS 4—12
04

GROUNDWORK

The part nobody photographs. The part that decides everything.

WEEKS 12—20
05

THE FRAME

Oak and steel, plumb to three millimetres.

WEEKS 20—34
06

THE ENVELOPE

Closed in before winter, then tested with a fan door.

WEEKS 34—52
07

THE FIT-OUT

Joinery from our own bench. Bronze aged in the yard.

WEEKS 52—88
08

HANDOVER

A single key, a maintenance book, a standing invitation.

WEEKS 88—96
A-006 · THE PALETTE

Material honesty.

Four materials, chosen to age rather than to date. Run your hand over them — everything here answers to touch.

PURBECK STONE
M-01

PURBECK STONE

The ground it stands on, brought up into the walls.

ENGLISH OAK
M-02

ENGLISH OAK

Cut two counties away, seasoned twenty-six months in our yard.

CAST GLASS
M-03

CAST GLASS

Light, held to the same tolerances as the steel around it.

SHIP'S BRONZE
M-04

SHIP'S BRONZE

Door furniture that will wear to the shape of your hand.

A-007 · THE RECORDTALLIED AT THE YARD · AS OF 2026
34HOUSES BUILTEvery one still standing. Most still write.
15YEARS AT WORKOne yard. No branches, no franchises.
22MONTHS, AVERAGE BUILDFrom first survey to the final key.
3PROJECTS A YEARChosen slowly. Built slower.

No show homes. No spec work. No second crews. Every house on this site was built by the same hands that drew it.

A finished Ashlar house at dusk
A house should outlivethe argument about how to build it.
A-008 · THE PROOF — RAVEN HOWE, 2019
A-009 · THE ATELIER

Eleven people. One bench.

Ashlar is a small atelier of builders, joiners and architects working from one yard in Gloucestershire. The people who draw your house are the people who build it — there is no handover between the two, because there is no gap.

We take three projects a year. Not because we could not take more, but because the founder still walks every site on Friday, and Fridays are finite.

“If a detail is wrong at ten metres, it is wrong. The client may never see it. The house knows.”

EDITH MARSH — FOUNDER, MASTER JOINER
Marking out a joint by hand
The drawing set on the bench
LICENSED DESIGN–BUILD CONTRACTOR · REG. NO. 048-221FEDERATION OF MASTER BUILDERSGUILD OF ARCHITECTURAL JOINERSFULLY INSURED TO £10M
A-010 · THE INVITATIONYOURS ISSTILL A DRAWING.
START A PROJECT

WE TAKE THREE PROJECTS A YEAR. ONE PLACE REMAINS OPEN FOR 2027.
14 QUARRY BENCH, KINGSHOLT, GLOUCESTERSHIRE GL1 4TN

Every house is holding its breath. We build the exhale.

START A PROJECT
A-000 · TITLE SHEET — ISSUED 2026

STUDIO

Ashlar Atelier
14 Quarry Bench, Kingsholt
Gloucestershire GL1 4TN

REVISION HISTORY

2011 A FOUNDED. ONE BENCH, TWO PEOPLE.2016 D THE YARD AT KINGSHOLT.2019 H RAVEN HOWE COMPLETES.2024 M THE GLASS FOLD.2026 N THIS SHEET ISSUED.

DRAWN / CHECKED

DRAWN MH · CHECKED RA · APPROVED EM

SCALE

1:1 — ALWAYS, IN THE END

STATUS

WE TAKE THREE PROJECTS A YEAR · ONE PLACE REMAINS OPEN FOR 2027

© 2026 Ashlar Atelier. All rights reserved.Privacy Notice·Terms of UseLicensed design–build contractor · Reg. No. 048-221 · Fully insuredEST. 2011
±0.000 — GROUND LINE

Create a free website with Framer, the website builder loved by startups, designers and agencies.